AI/GenAI Scrum Master

A team that finishes 5 items a sprint on average has 30 items left. "Six sprints" is a coin flip: it comes true 54% of the time. A range, "85% likely by sprint 7", is a promise you can keep.

Drag the work left. Switch between One date and A range, then press Simulate. Then we build the job piece by piece: sprints of uncertain experiments, forecasts, noisy evals, tracking, data lead times and risk.

You need a rough idea of what a sprint is and what a model eval score is. A little Python helps for the code. We build the rest from zero.

Scrum terms follow The Scrum Guide (Schwaber and Sutherland, November 2020). Every team, sprint and number on this page is an illustrative example made for teaching.

Forecast the finish

30 items

Illustrative team: the last 8 sprints finished 4, 7, 3, 6, 5, 2, 8 and 5 items. We compute the bars of chance exactly from those 8 sprints. Simulate draws random futures from the same 8 numbers and lands close to them.

Chapter 0

What the Role Does

Meet the job: keep a team of experimenters honest, unblocked and predictable when most of its work can fail

Monday morning. The two-week sprint ended. One experiment hit its accuracy target but costs four times the planned GPU budget to serve. One overfit and failed. One is "promising" and wants two more weeks. The product manager asks why the demo is not ready.

A Scrum Master is the person who makes this team work well. The Scrum Guide says the Scrum Master "is accountable for establishing Scrum as defined in the Scrum Guide." They do not train the models. They shape how the team plans, decides and reports.

Scrum in one table

Scrum splits work into sprints: fixed-length cycles of one month or less. Three accountabilities share the team.

WhoOwnsCommits to
Product Ownerthe Product Backlog: what to build, in what orderthe Product Goal
Developersthe Sprint Backlog: the plan for this sprintthe Sprint Goal
Scrum Masterhow well the team runs Scrumremoving what slows the team

Four events repeat each sprint. For a one-month sprint the guide caps Sprint Planning at 8 hours and the Daily Scrum at 15 minutes. The Sprint Review gets 4 hours and the Retrospective 3. The guide does not mention story points or velocity. Those are team habits, and on AI teams they break first.

Why AI work is different

A web feature usually works once the team builds it. An experiment is a test of a guess, such as "fine-tuning will lift accuracy from 72% to 85%". It can fail even when the team does everything right. So a sprint of three good experiments can end with nothing to ship.

How often? Call the chance that one experiment succeeds p. Call the number of experiments in the sprint n. Assume one result does not change another.

Say it aloud

P-none equals one minus p, to the power n.

Pnone
P-none the chance that the sprint ends with zero successful experiments.
p
p the chance that one experiment succeeds, from 0 to 1.
1 − p
one minus p the chance that one experiment fails.
n
to the power n multiply the failure chance by itself once per experiment, because all n must fail.
In plain words

Take the chance one experiment fails, 1 − p. Multiply it by itself n times. That is P-none, the chance every experiment fails.

With numbers

With made-up numbers: p = 0.3 and n = 3. P-none = 0.7 × 0.7 × 0.7 = 0.343. About one sprint in three ends with no win, and nobody did anything wrong.

Run twenty sprints

Each row is one sprint. Each dot is one experiment: green won, grey failed. Set the odds and the count, then run.

30%
3

Illustrative odds. Real success rates depend on the team and the problem; nobody has a fair industry-wide number.

The failure: a manager reads a no-win sprint as a lazy sprint. Measure it: compare the count of no-win sprints with P-none. If they match, the plan was the problem, not the people. Fix: plan more, cheaper experiments, and make the Sprint Goal a decision ("pick fine-tuning or retrieval") that the sprint can always reach.

The road

  1. The loop and the kill: hypothesis, run, evaluate, decide; rules to stop.
  2. Plan a sprint of bets: tickets as hypotheses; expected wins under a GPU budget.
  3. Velocity is a spread: the same average can hide different risk.
  4. Forecast with Monte Carlo: the hero, explained step by step.
  5. Done on a spectrum: a pass threshold meets a noisy eval score.
  6. Track and flow: the experiment log, and why fewer experiments in flight finish sooner.
  7. Data and handoffs: label lead times and the move to production.
  8. Risk burndown: turn worries into days of expected delay and shrink them.
  9. GenAI and agents: prompt changes, slice regressions and action gates.
  10. The field guide: numbers, checklist, code and links.
Three experiments each have a 30% chance to succeed. About how often does a sprint end with no success at all?

Chapter 1

The Loop and the Kill

Run each experiment through one loop, and agree before it starts on the rules that stop it

A roadmap says "Q1 build the model, Q2 integrate, Q3 launch." That plan treats model work as a line. It is a loop, and a team may go round it ten times before one result is good enough to ship.

  1. Hypothesis. Write the guess and the number that would prove it.
  2. Design. Fix the dataset, the eval set, the compute budget and the time box.
  3. Run. Train, prompt or tune. Log every run.
  4. Evaluate. Score on the frozen eval set and compare with the baseline.
  5. Decide. Kill, iterate or promote. Write down what you learned.

Step 5 is where teams stall. A researcher who is close to a result wants one more run, and then another. So the team writes kill criteria, rules that end an experiment, before step 3 starts. Rules written in advance remove the argument later.

Step through the runs

Pink dots are the accuracy after each run; the pink line is the 90% target. The bar below is GPU hours used against the budget. Add runs until a rule fires.

4

Illustrative run: accuracy 72, 78, 81, 82.5, 83.1, 83.4, 83.6, 83.7, 83.75; 6 GPU hours per run; a 24-hour budget. The two rules are one team's choice, not a standard.

Here are this team's two rules. Plateau: stop if the last three runs sit within 1 point of each other. Budget: stop if compute passes twice the budget, 48 hours. Work it: after run 5 the last three are 81, 82.5 and 83.1, a spread of 2.1 points. After run 6 they are 82.5, 83.1 and 83.4, a spread of 0.9. The plateau rule fires at 36 GPU hours, well before the budget rule at run 9.

At that point the model is at 83.4% against a 90% target. Small tuning will not close 6.6 points. The honest move is a different approach, or a smaller target agreed with the Product Owner.

Explore, then exploit

Early in a project, try several approaches and kill most of them. Near a deadline, stop trying new ones and polish one. A new idea at week 10 of 16 gets one sprint and one kill rule: "if it does not beat 83.4% by the review, we stop."

The failure: a team "almost done" for five sprints. Measure it: count experiments open longer than their time box. Fix: every ticket carries a time box and a kill rule, and the review ends each with kill, iterate or promote.

Why does a team write kill criteria before an experiment starts?

Chapter 2

Plan a Sprint of Bets

Write tickets as hypotheses, then pick the set of experiments that fits the budget and wins most often

A researcher says the ticket "fine-tune the model" is 5 points. How long will training take? "Depends on the data." Will it work? "Maybe." A point estimate here gives false comfort. A better ticket states the guess, the test and the stop rule.

EXP-042  Fine-tune an 8B open model on 50K support tickets
Hypothesis  accuracy rises from 72% (zero-shot) to ≥ 85%
            on the frozen 500-question eval set
Budget      24 GPU hours, time box 1 sprint
Data        tickets v3 (hash a91c), split 80/10/10
Kill if     plateau (3 runs within 1 pt) or 48 GPU hours
Odds        researcher's guess: 40%

The last line matters. "I think there is a 40% chance this works" is a useful estimate. With odds on each ticket, planning becomes a choice among bets.

Which bets? Say each experiment i has a success chance pi. Add them to get the number of wins you expect.

Say it aloud

E equals the sum over i of p-i.

E
E the expected number of wins: the average count over many sprints like this one.
Σi
the sum over i add one term for each experiment you picked.
pi
p-i the success chance of experiment i, from its ticket.
In plain words

Read the odds p-i off each picked ticket. Add them. E is the wins you expect on average, not a promise for this sprint.

With numbers

With made-up numbers: pick A, C and E with odds 0.4, 0.6 and 0.5. E = 0.4 + 0.6 + 0.5 = 1.5 wins. The chance of at least one win is 1 − 0.6 × 0.4 × 0.5 = 0.88.

Fill the sprint under 100 GPU hours

Each warm block is one experiment: its odds and its GPU cost. Toggle experiments in and out. Find the set with the most expected wins that fits.

Illustrative tickets. The odds are guesses, which is the point: a guess you can argue with beats a point estimate you cannot.

The best set here is A, C and E: 88 GPU hours, 1.5 expected wins. The big, unlikely bet B looks bold but adds only 0.2 wins for 40 hours.

The Sprint Goal then commits to decisions, not outcomes: "decide by the review whether fine-tuning beats retrieval on our eval set." The team can reach that goal even if every bet loses.

The failure: velocity swings from 30 points to 8 and back. Measure it: count tickets that ended with a written decision. Fix: measure throughput as decided experiments, and plan by odds and budget.

Three picked experiments have odds 0.4, 0.6 and 0.5. What is the expected number of wins?

Chapter 3

Velocity Is a Spread

See why two teams with the same average speed can give different answers to "when"

The VP asks when the support assistant ships. The backlog has 30 items left. Over the last 8 sprints the team finished 4, 7, 3, 6, 5, 2, 8 and 5 items. The average is 5 a sprint.

Throughput is the count of items a team finishes in one sprint. Many teams call the average throughput velocity. The obvious forecast divides the work by it. Call the items left R and the average throughput v̄.

Say it aloud

S equals R divided by v-bar.

S
S the forecast number of sprints until the work is done.
R
R the items still left in the backlog.
v̄
v-bar the average throughput: items finished per sprint, averaged over past sprints.
In plain words

Average the past throughput to get v-bar. Divide the work left R by it. S is the sprint count if every sprint were exactly average.

With numbers

With made-up numbers: R = 30 and v-bar = 5. S = 30 / 5 = 6 sprints. Count the futures, and the team finishes by sprint 6 only 54% of the time.

Why only 54%? Real sprints are not average. Half of them fall below it, and a slow sprint early pushes every later date. The average hides the spread, and the spread is the risk.

Same average, different risk

Warm bars are the 8 past sprints. Blue bars are the chance to finish 30 items by each sprint. Switch teams and watch the blue bars.

Illustrative teams. Both average 5 items a sprint; the steady team's spread (standard deviation) is 0.76 items, the lumpy team's is 2.0. We compute chances exactly by treating each future sprint as a draw from the 8 past ones.

Read the blue bars at sprint 7. The steady team is 99.9% likely to be done. The lumpy team is 86% likely. Both teams have a v-bar of 5. Only the spread differs.

AI teams are lumpy by nature. A training run diverges, a vendor is late, a lucky prompt change closes three tickets at once. So an AI team needs the spread more than most.

The failure: every date slips by a sprint or two. Measure it: log how often the team hit its forecast date. Near 50% means you forecast with the average. Fix: forecast with a range, as Chapter 4 shows.

Two teams both average 5 items a sprint. Why can one be far more likely to finish 30 items by sprint 7?

Chapter 4

Forecast with Monte Carlo

Replay the past thousands of times to turn eight sprints into a range you can promise

You cannot see the future sprints. You can see the last 8. Monte Carlo forecasting assumes the next sprints will look like a random pick from the past ones. Then it plays out thousands of possible futures and counts.

  1. Set the work left to R = 30.
  2. Pick one past sprint at random, say 6. Subtract it: 24 left.
  3. Pick again and subtract. Repeat until the work reaches zero. Write down how many picks it took.
  4. Run steps 1 to 3 many times, say N = 10,000 futures.
  5. For each sprint k, count the futures that finished by k.

Play out the futures

Each warm line is one future: the work left falling sprint by sprint. Blue bars count where futures finish. Press a button and watch the bars settle.

Illustrative team (the lumpy team from Chapter 3), 30 items left. Futures are random, so your counts move a little from run to run. The exact chances are 54.3% by sprint 6, 86.5% by 7 and 97.7% by 8.

Step 5 is the whole forecast. Call the number of futures N, and the number that finished by sprint k nk.

Say it aloud

P of done by k is about n-k divided by N.

P(done by k)
P of done by k the chance the work is finished at the end of sprint k.
nk
n-k how many simulated futures finished at sprint k or sooner.
N
N how many futures you simulated in total.
≈
is about the count gets closer to the true chance as N grows.
In plain words

Count the futures that finished by sprint k. Divide by N, the futures you ran. That share is your chance of being done by sprint k.

With numbers

With made-up numbers: N = 10,000 futures, and n-k = 8,657 finished by sprint 7. P = 8,657 / 10,000 = 86.6%. The exact answer is 86.5%.

Now give the answer as two numbers. The P50 is the first sprint with at least a 50% chance: sprint 6. The P85 is the first with at least 85%: sprint 7. Say: "Even odds by sprint 6. 85% likely by sprint 7." Re-run the forecast after every sprint; the range narrows as work finishes.

pythonimport random
past = [4, 7, 3, 6, 5, 2, 8, 5]          # items finished per past sprint

def one_future(left):                 # left: int, items still to do
    sprints = 0
    while left > 0:
        left -= random.choice(past); sprints += 1
    return sprints                       # int: sprints this future needed

runs = sorted(one_future(30) for _ in range(10_000))
p50, p85 = runs[4_999], runs[8_499]      # 6 and 7 for this team

The failure: the forecast uses sprints from a different team setup, before two people left. Measure it: check that the past sprints match today's team and kind of work. Fix: use only recent, similar sprints, and say how many.

Of 10,000 simulated futures, 5,426 finish by sprint 6 and 8,645 by sprint 7. What do you tell the VP?

Chapter 5

Done on a Spectrum

Write a Definition of Done for a model, then learn how much a single eval score can wobble around it

The Definition of Done is the Scrum Guide's term for the quality bar every piece of finished work must meet. For a web feature it is a checklist. For a model it is a set of thresholds on a frozen eval set: a fixed list of test questions the model never trains on.

Say the bar is 90% accuracy on 500 questions. Monday's run scores 91%. Is the model done? Not yet. The 500 questions are a sample of all the questions users will ask. A different sample of 500 would give a different score.

How much different? Call the model's true accuracy on all user questions a, and the number of eval questions n. The typical size of the wobble is the standard error.

Say it aloud

SE equals the square root of a times one minus a, over n.

SE
S-E the standard error: how far a measured accuracy typically lands from the true one.
√
the square root of undoes the squaring inside; four times the questions halves the wobble.
a
a the true accuracy, from 0 to 1. a(1 − a) is largest at 0.5.
n
n the number of questions in the eval set.
In plain words

Multiply a by 1 − a. Divide by n. Take the square root. A measured score usually lands within about two SEs of a.

With numbers

With made-up numbers: a = 0.91 and n = 500. SE = √(0.91 × 0.09 / 500) = 0.0128, about 1.3 points. A 95% band is about ±2.5 points, so 91% could be anywhere from 88.5% to 93.5%.

Re-run the eval many times

Each pink dot is one eval run on a fresh set of questions. Green dots pass the 90% bar, red dots miss it. Change the true accuracy and the eval size.

91%

Illustrative model. The pass chance uses the normal approximation to the count of correct answers. An exact binomial count gives 81% instead of 78% at 91% and 500 questions.

At a true 91% and 500 questions, a single run passes only about 78% of the time. "It passed on Monday" says little. Two fixes work. Grow the eval set, since 2,000 questions halve the wobble. And compare the new model with the old one on the same questions, so both share the same luck.

Re-running with five random seeds does not fix this. Seeds change the model's sampling, not which questions you asked. The question sample stays the main source of wobble.

The failure: a model ships after one lucky run and scores 88% in production. Measure it: report every score with its band. Fix: write the Definition of Done as "the lower edge of the band clears the bar." For the statistics, see The Statistics of Evaluation.

An eval set has 500 questions and the model scores 91% against a 90% bar. What is the honest reading?

Chapter 6

Track Experiments, Limit the Flow

Keep one log that answers every status question, and cap the work in flight so each experiment finishes sooner

The VP asks how close the model is. The best settings live in a notebook cell. The eval result is in last Thursday's chat. Nobody knows which dataset the best run used. That team cannot answer, and cannot reproduce its best result.

An experiment log is one record per run, kept by a tracking tool such as MLflow or Weights & Biases. Each record holds the same fields.

FieldExampleAnswers
Configmodel, settings, code commitCan we re-run it?
Data versiontickets v3, hash a91cWhich data did it see?
Metricsaccuracy 83.4% ± 2.6 on eval v2Is it better than the baseline?
Decisionkilled: plateau at run 6What did we decide, and why?

The Scrum Master reads status from the log, not from people. The sprint review shows the log's decisions: what the team killed, what it promoted, and what it learned.

Fewer in flight, faster out

A team starts every promising idea at once. Now six experiments share two GPUs and one reviewer, and each one crawls. Work in progress (WIP) is the number of items started and not yet finished. Cycle time is how long one item takes from start to decision. Little's law links them with throughput.

Say it aloud

T equals L divided by lambda.

T
T the average cycle time: weeks from starting an experiment to its decision.
L
L the average WIP: experiments open at the same time.
λ
lambda the average throughput: experiments decided per week.
In plain words

Count the experiments open, L. Divide by how many the team decides each week, lambda. T is how long each one waits, on average.

With numbers

With made-up numbers: L = 6 open and lambda = 2 decided per week. T = 6 / 2 = 3 weeks each. Cap WIP at 3 and T = 1.5 weeks, with the same throughput.

Cap the work in flight

Warm cards are open experiments. Two leave each week to a decision. Set the WIP cap and watch how long each card waits.

6

Illustrative flow at a fixed 2 decisions a week. Little's law holds for long-run averages of a stable system; a single week can differ.

Throughput did not change; the GPUs and the reviewer set it. Only the waiting changed. With a cap of 3, each result arrives in half the time, and the team learns twice as fast from each decision.

The failure: many experiments "in progress", few decisions. Measure it: plot WIP and decisions per week. Fix: set a WIP cap on the "running" column, near the number of GPUs or reviewers.

A team decides 2 experiments a week and keeps 8 open. What is the average cycle time?

Chapter 7

Data Lead Times and Handoffs

Request data before the sprint that needs it, and check a model at the border between research and production

Sprint planning. The engineer can start as soon as the labels arrive. The vendor quoted 12 business days. The sprint is 10 days, and training needs the labels by day 3. The plan fails, and nobody noticed until now.

A lead time is the delay from asking for something to having it. Data has long ones: collection, legal review, labeling, quality checks. So the Scrum Master runs a data lookahead: in each planning, ask what sprint N+1 and N+2 will need, and request it now.

Order the labels in time

Three sprints of 10 business days. The purple bar is the wait for labels. The experiment needs them by day 3 of sprint 2. Move the request day and the lead time.

day 3
12 days

Illustrative vendor and sprint. Days are business days, counted from day 1 of sprint 1.

Work it. A request on day 1 with a 12-day lead time arrives on day 13. Day 13 is day 3 of sprint 2, just in time. Request on day 3 and the labels land on day 15, two days late. The fix costs nothing but a habit: order data one sprint early, and ask the vendor for a small pilot batch first to check quality.

The handoff to production

The researcher posts "92% accuracy, notebook attached." In production the score drops. A handoff checklist catches the usual causes before release.

CheckWhy it failsHow to test
Train and eval sets do not overlapeval questions leaked into training inflate the scoreintersect the two ID lists; expect zero
Same preprocessingserving cleans text differently from trainingrun the eval through the serving code
Pinned versionslibrary versions differ between laptop and serverbuild the container and re-run the eval
Latency under loadone request at a time is fast; real traffic is notload test at expected peak traffic
Rollbackno quick way back when quality dropspractise a switch to the old model

The failure: experiments wait on data most sprints. Measure it: the share of planned experiments whose data was ready on time. Fix: a data column on the board, and the lookahead in every planning.

Labels take 12 business days. The experiment needs them by day 3 of the next 10-day sprint. When must you request them?

Chapter 8

Burn Down the Risk

Turn each worry into expected days of delay, then spend sprints shrinking the biggest ones first

The forecast from Chapter 4 replays the past. It knows nothing about the legal review that has not happened yet, or the vendor that missed its last date. Those risks need their own list.

A risk register is that list. For each risk, write two guesses: the chance it happens, p, and the delay in days if it does, d. Their product is the risk's exposure.

Say it aloud

X equals the sum over j of p-j times d-j.

X
X the total exposure: expected days of delay from all listed risks.
Σj
the sum over j add one term for each risk on the register.
pj
p-j the chance that risk j happens, from 0 to 1.
dj
d-j the delay in working days if risk j happens.
In plain words

For each risk, multiply its chance p-j by its delay d-j. Add the products. X is the delay you should expect on average.

With numbers

With made-up numbers: vendor late 0.5 × 10 = 5, GPU shortage 0.3 × 5 = 1.5, eval regression 0.4 × 8 = 3.2, legal review 0.2 × 15 = 3. X = 12.7 days.

Mitigate one risk a sprint

Yellow blocks are each risk's exposure in days. Toggle a mitigation to shrink its block. The line below tracks total exposure sprint by sprint.

Illustrative register. The pilot batch cuts vendor odds from 0.5 to 0.2. Reserved GPUs cut shortage odds from 0.3 to 0.1. An eval gate cuts a regression's delay from 8 days to 3. Booking legal early cuts its odds from 0.2 to 0.05.

Order matters. The pilot batch removes 3 days of exposure, the most of any single step, so it goes first. After all four, X falls from 12.7 days to 4.45. Chart X each sprint; that falling line is a risk burndown. Add the remaining X to the Monte Carlo P85 when you quote a date.

The failure: the team writes the register once and never reads it. Measure it: is X lower than last sprint? Fix: review the top two risks at each planning and put one mitigation in the Sprint Backlog.

A risk has a 0.4 chance and would cost 8 days. Another has a 0.2 chance and would cost 15 days. Which has more exposure?

Chapter 9

GenAI and Agent Work

Treat every prompt change as an experiment with a slice check, and gate agents by what their actions can break

The team edits the system prompt to handle refund questions better. Refund accuracy rises from 78% to 91%. General questions fall from 89% to 82%. Is the change a win?

On a GenAI team the "code" is often a prompt, and a one-paragraph edit can move every answer. So each prompt version is an experiment: versioned, evaluated on every slice (a group of questions, such as refunds), and compared with the last version. To judge the whole change, weight each slice by its share of real traffic.

Call slice i's share of traffic wi and its accuracy ai.

Say it aloud

A equals the sum over i of w-i times a-i.

A
A the accuracy a typical user sees, across all traffic.
Σi
the sum over i add one term per slice; the shares add to 1.
wi
w-i the share of traffic in slice i, from 0 to 1.
ai
a-i the accuracy on slice i.
In plain words

Multiply each slice's accuracy a-i by its traffic share w-i. Add them. Do it for the old and the new prompt and compare the two A values.

With numbers

With made-up numbers: refunds are 10% of traffic. Before, A = 0.1 × 0.78 + 0.9 × 0.89 = 0.879. After, A = 0.1 × 0.91 + 0.9 × 0.82 = 0.829. Users see 5 points worse.

Weigh the slices by traffic

Pink bars are slice accuracy before and after the prompt change. The pair of wide bars is what users see overall. Drag the refund share.

10%

Illustrative slices and accuracies. The break-even refund share for these numbers is 35%.

The change wins only if refunds pass 35% of traffic. At 10% it loses. The usual fix: iterate on a prompt that helps refunds without hurting general questions. Then make the slice table part of the Definition of Done. Read more in Metric Design and Experiment Design.

Agents: gate by blast radius

An agent is a model that takes actions: it sends email, edits records, runs code. Its failures are wrong actions, not wrong words. So plan its sprints around gates, one per level of harm.

GateThe agent mayExit test
Sandboxcall mock tools onlyscripted scenarios pass; no loops past a step limit
Stagingcall real tools on test dataadversarial prompts fail to trigger unapproved actions
Productionact for users, with limitsrate limits, a kill switch, human approval for actions that cannot be undone

The failure: a prompt "tweak" ships and one slice silently drops. Measure it: the slice table, old against new, on every change. Fix: no prompt merges without the slice table and the weighted A.

Refunds are 10% of traffic. A prompt change lifts refunds from 78% to 91% and drops general questions from 89% to 82%. What happens overall?

Chapter 10

The Field Guide

Keep the terms, the numbers, the checklist and the code in one place

The Scrum Master on an AI team plans bets, not features, and quotes ranges, not dates. They read scores with their bands, keep one experiment log, order data early and burn down risk. Each of those skills rests on a small calculation you can do by hand.

TermRule or formulaWorked number
No-win sprint(1 − p)np 0.3, n 3: 34%
Kill criteriawritten before the first runplateau fires at run 6, 36 GPU hours
Expected winssum of the odds0.4 + 0.6 + 0.5 = 1.5
Naive forecastR / v̄30 / 5 = 6 sprints, hit 54% of the time
Monte Carlo rangenk / NP50 sprint 6, P85 sprint 7
Eval wobble√(a(1 − a)/n)0.91, 500 questions: ±2.5 points
Little's lawT = L / λ6 / 2 = 3 weeks
Data lookaheadrequest by need date minus lead time12-day lead: request on day 1
Risk exposuresum of p × d12.7 days, 4.45 after mitigations
Traffic-weighted accuracysum of w × a87.9% to 82.9%

Sprint checklist

The core as code

pythonimport random, math

def forecast(past, left, n=10_000):            # past: list[int] items per sprint
    runs = []
    for _ in range(n):
        r, k = left, 0
        while r > 0: r -= random.choice(past); k += 1
        runs.append(k)
    runs.sort()
    return runs[n // 2], runs[int(n * .85)]     # (P50, P85) in sprints

def eval_band(acc, n_questions):                # acc in [0, 1]
    se = math.sqrt(acc * (1 - acc) / n_questions)
    return acc - 1.96 * se, acc + 1.96 * se

def exposure(risks):                            # risks: list[(chance, days)]
    return sum(p * d for p, d in risks)

print(forecast([4, 7, 3, 6, 5, 2, 8, 5], 30))        # (6, 7)
print(eval_band(0.91, 500))                       # (0.885, 0.935)
print(exposure([(.5, 10), (.3, 5), (.4, 8), (.2, 15)]))   # 12.7

Keep going

The takeaway. Plan bets with odds, forecast with a range, read every score with its band, and shrink the biggest risk each sprint. The numbers are small; the habit of using them is the job.
Which status line is the most useful to a VP?

Now press Present or Teach and explain three things from memory. Why can a sprint of good bets end with no win? How does Monte Carlo turn eight sprints into a range? Why may 91% not clear a 90% bar? Then go back to the hero and drag the work left until the P85 moves.